Báo Bình Dương điện tử - www.baobinhduong.vn
Tổng Biên tập: LÊ MINH TÙNG
Phó Tổng Biên tập: HUỲNH MINH DÂN - NGUYỄN QUỐC LIÊM
On February 18, Binh Duong Power Company said that in January 2022, the whole province has adapted to the new normal state. The province’s socio-economic activities gradually recovered compared to 2021…Therefore, the company’s production and business situation had many bright spots. The indicator of commercial electricity and the average selling price of electricity increased over the same period in 2021; power grid failures tended to decrease, ensuring safe and uninterrupted power supply.
The power sector will start construction of many power projects at the local demand for power in the coming years
In January 2022, the company’s total output of commercial power realized is 1,265 million kWh. Of these, commercial power output to the 22kV voltage level reached 1,129 million kWh, up 3.94% over the same period in 2021 while power output for industrial manufacture increased by 2.86% against the same period in 2021, accounting for 78.5% of total and decreasing by 0.3% over the same period in 2021.
Reported by Minh Duy-Translated by Kim Tin